Vertical Roller Mill Installation Steps

Vertical Roller Mill Installation Steps Vertical Roller Mill Installation Steps

 Vertical Roller Mill installed "trilogy"

Principles of Vertical Roller Mill installed: large scale projects, equipment weight large size, high installation accuracy, so be sure to be wary of the installation of Vertical Roller Mill. In accordance with the requirements of the ISO quality assurance s system. Vertical Roller Mill installed to follow the principles of compliance, advance and rationality. That is, the premise is to install target according to customer requirements, using scientific methods, and in line with the objective conditions of the project.
Vertical Roller Mill machine installation steps
Installation sequence: Vertical Roller Mill-specific installation process is such that first the basic acceptance of the equipment, check for any missing pieces or wear, and can carry out the installation of equipment and components. Followed by host bases, motor base, Vertical Roller Mill machine, reducer, shell, millstones, grinding rollers, seal gas pipeline, separator, actuators, hydraulic equipment, roll grinding temperature measuring device, cooling water pipes are sequential in the order of installation.


Install the "trilogy": the preparatory work before the first step is to install according to the production environment and the Foundation as well as the installed base of the mill dimensions retain enough height and position, pay attention to once cement Foundation poured, there must be a period of 15 days to recover. Two or three tons of lifting tools had to be developed for installation. In addition, all parts for cleaning and inspection of the mill. The second step is the details of the installation process, you want to follow the instruction manual for details of the installation process, you need to note that during the installation of the belt before you start the motor, then adjust the motor wiring, their rotation direction consistent with the signs for a dual-motor drive spindle motor Assembly and both sides. After the third step is the installation of the work, should undertake a comprehensive inspection to check the oil tube is securely attached, the adequacy of fasteners-fastening, hosts the base level of alignment, and so on.
Vertical Roller Mill machine installation process
Vertical milling machine (referred to as Vertical Roller Mill) the grinding mechanism is the same as Raymond mill, are property of compacted crushed. Because of the pressure roller is the use of high pressure hydraulic way. Roller compaction of material pressure dozens of times or even greater, so its efficiency is far better than that of Raymond mill is currently mass produced mainstream equipment of the TSP. Common for two-roll Vertical Roller Mill structure is mainly used in the production of less than 400 heads of powders. Later developed three Vertical Roller Mill, fine powder content is greatly improved but is still based on a one-time 600 heads of production the following products are a plus.   reformed upper classifier can be used directly in the production of ultra-fine powder 1250 mesh. Gilman hung-HLMVertical Roller Mill, which has high grinding efficiency, low power consumption, feed size and fineness of product is easy to adjust, simple process, small size, low noise, dust, easy maintenance, low operating costs, the advantages of wear-resisting material consumption. In order, to obtain a thinner product, Vertical Roller Mill can be used for the production of the 600-1000 items served with ultra-fine classifier for secondary classification in the production of more than 1250 Eye products. Gilman hung-HLMX ultra thin Vertical Roller Mill, using static and dynamic combined classifier, product fineness at 325-2500 mesh (5 μ m m-40) adjustme